The jobsite dictionary · Construction
⚡ Electrical
100 electrical terms with how to say them in Spanish, an example from the job, and audio. From ChambaTalk's free construction glossary.
- AFCI ay-ef-see-AIinterruptor AFCI een-teh-roop-TOHR ah-EF-see-EE Safety-critical
A breaker that detects dangerous arcing in the wiring and trips to prevent fires.
The bedroom circuits need AFCI breakers per code. — Los circuitos de las recámaras necesitan interruptores AFCI según el código.
- amperage AM-per-ijamperaje ahm-peh-RAH-heh
The amount of current flowing through a wire, measured in amps.
That saw pulls a lot of amperage on startup. — Esa sierra jala mucho amperaje al arrancar.
- arc flash ARK FLASHarco eléctrico AR-koh eh-LEK-tree-koh Safety-critical
An explosive release of electrical energy that can burn or kill; live panel work requires rated PPE.
Wear your arc flash gear before racking that breaker. — Ponte tu equipo contra arco eléctrico antes de mover ese interruptor.
Also: relámpago de arco (general)
- ballast BA-lustbalastro bah-LAHS-troh
The unit inside a fluorescent or HID fixture that controls current to the lamps.
That flickering usually means the ballast is going bad. — Ese parpadeo casi siempre es que el balastro ya va de salida.
Also: balasto (general)
- bender BEN-derdobladora doh-blah-DOH-rah
The tool used to bend conduit into offsets, 90s, and saddles.
Grab the half-inch bender and put a 90 on this stick. — Agarra la dobladora de media y hazle un noventa a este tramo.
- breaker BRAY-kerinterruptor een-teh-roop-TOHR
The switch in the panel that trips and cuts power when a circuit pulls too much current.
The breaker tripped again; something is overloading that circuit. — Se volvió a botar el interruptor; algo está sobrecargando ese circuito.
Also: pastilla (MX) · disyuntor (general)
- bulb BULBfoco FOH-koh
The replaceable lamp that screws or snaps into a fixture.
Put daylight bulbs in the work lights. — Ponle focos de luz de día a las lámparas de trabajo.
Also: bombilla (general) · bombillo (PR)
- busbar BUS-barbarra de distribución BAH-rrah deh dees-tree-boo-SYOHN Safety-critical
The metal bar inside a panel that the breakers snap onto and draw power from.
Never touch the busbar; it stays hot even with the branch breakers off. — Nunca toques la barra de distribución; sigue viva aunque apagues las pastillas.
- bushing BUH-shingboquilla boh-KEE-yah
A smooth ring on the end of a conduit or connector that keeps the edge from cutting the wires.
Put a plastic bushing on before you pull the feeders. — Ponle una boquilla de plástico antes de jalar los alimentadores.
- cable KAY-bulcable KAH-bleh
Two or more insulated wires bundled together inside one outer jacket.
That cable feeds the whole second floor. — Ese cable alimenta todo el segundo piso.
- ceiling fan SEE-ling FANventilador de techo ven-tee-lah-DOHR deh TEH-choh
A fan hung from the ceiling; it needs a box rated to carry its weight.
Use a fan-rated box for that ceiling fan. — Usa una caja para ventilador para ese ventilador de techo.
Also: abanico de techo (PR)
- circuit SER-kitcircuito seer-KWEE-toh
One complete wiring path from a breaker out to its outlets or lights and back.
The kitchen counters need two 20-amp circuits. — Las barras de la cocina necesitan dos circuitos de 20 amperes.
- conduit KON-doo-ittubo conduit TOO-boh kon-DOO-eet
Metal or plastic tubing that protects electrical wires run through walls, slabs, and ceilings.
Run the conduit along the ceiling before they hang the drywall. — Corre el tubo conduit por el techo antes de que pongan la tablaroca.
Also: tubería eléctrica (general)
- conduit body KON-doo-it BAH-deecondulete kon-doo-LEH-teh
A fitting with a removable cover, like an LB, that gives access for pulling wire around a tight turn.
Put a conduit body where the pipe turns into the building. — Pon un condulete donde el tubo da vuelta hacia el edificio.
- connector koh-NEK-torconector koh-nek-TOHR
The fitting that secures conduit or cable where it enters a box or panel.
Every cable needs a connector where it enters the panel. — Cada cable necesita un conector donde entra al panel.
- continuity kon-tih-NOO-ih-teecontinuidad kon-tee-nwee-DAHD
An unbroken electrical path; you test for it to find breaks in a wire.
Check continuity on that run before you terminate it. — Checa la continuidad de esa corrida antes de conectarla.
- coupling KUP-lingcople KOH-pleh
The fitting that joins two lengths of conduit end to end.
You're short a coupling for that last stick of EMT. — Te falta un cople para ese último tramo de EMT.
- cover plate KUH-ver PLAYTtapa TAH-pah
The finish plate screwed over an outlet or switch to cover the box.
Install the cover plates after the painters finish. — Coloca las tapas después de que terminen los pintores.
Also: placa (general)
- de-energize dee-EH-ner-jaizdesenergizar des-eh-nehr-hee-SAHR Safety-critical
To shut off and verify zero voltage on equipment before working on it.
De-energize the feeder and test it before you cut. — Desenergiza el alimentador y pruébalo antes de cortar.
- dedicated circuit DEH-dih-kay-ted SER-kitcircuito dedicado seer-KWEE-toh deh-dee-KAH-doh
A circuit that serves only one appliance, like a microwave or dryer.
The code requires a dedicated circuit for the dishwasher. — El código pide un circuito dedicado para la lavatrastes.
- diagonal cutters dai-AH-goh-nal KUH-terspinzas de corte PEEN-sahs deh KOR-teh
Angled cutting pliers for snipping wire flush; crews call them dikes.
Hand me the dikes to trim these pigtails. — Pásame las pinzas de corte para recortar estas colitas.
- dimmer DIH-meratenuador ah-teh-nwah-DOHR
A switch that lets you raise or lower the brightness of the lights.
The dining room lights go on a dimmer. — Las luces del comedor van con atenuador.
Also: dimmer (MX)
- disconnect dis-koh-NEKTdesconectador des-koh-nek-tah-DOHR Safety-critical
A switch box near equipment that cuts all power to it for safe service.
Pull the disconnect before you open the condenser. — Baja el desconectador antes de abrir la condensadora.
Also: interruptor de seguridad (general)
- doorbell DOR-beltimbre TEEM-breh
The low-voltage button and chime system at the entry door.
The doorbell transformer mounts next to the panel. — El transformador del timbre se monta junto al panel.
- electrical tape ee-LEK-trih-kul TAYPcinta de aislar SEEN-tah deh ah-ees-LAHR
Stretchy vinyl tape used to insulate and wrap electrical connections.
Wrap the splice with electrical tape before closing the box. — Forra el empalme con cinta de aislar antes de cerrar la caja.
Also: cinta aislante (general)
- EMT ee-em-TEEtubo EMT TOO-boh eh-em-eh-TEH
Thin-wall steel conduit that bends with a hand bender; the most common conduit in commercial work.
We need ten sticks of half-inch EMT for this hallway. — Necesitamos diez tramos de EMT de media pulgada para este pasillo.
Also: conduit de pared delgada (general)
- extension cord ek-STEN-shun KORDextensión eks-ten-SYOHN
A portable cord for temporary power to tools; damaged cords must come off the job.
Run a heavy extension cord out to the saw station. — Lleva una extensión gruesa hasta la estación de la sierra.
- fish tape FISH TAYPguía GHEE-ah
A flat flexible steel or fiberglass line pushed through conduit to pull wires back.
Feed the fish tape from the panel and I'll grab it at the box. — Mete la guía desde el panel y yo la agarro en la caja.
- flexible conduit FLEK-sih-bul KON-doo-ittubo flexible TOO-boh flek-SEE-bleh
Spiral metal or plastic conduit that bends by hand, used for short connections to equipment.
Use flexible conduit for the last three feet to the motor. — Usa tubo flexible en los últimos tres pies hasta el motor.
Also: coflex (MX)
- fuse FYOOZfusible foo-SEE-bleh
A one-time protective device with a metal strip that melts and opens the circuit on overload.
The disconnect for the AC takes 30-amp fuses. — El desconectador del aire lleva fusibles de 30 amperes.
- gauge GAYJcalibre kah-LEE-breh
The thickness of a wire; a smaller number means a thicker wire that carries more current.
That circuit needs 12 gauge wire, not 14. — Ese circuito necesita alambre calibre 12, no 14.
- GFCI jee-ef-see-AIinterruptor GFCI een-teh-roop-TOHR hee-EF-see-EE Safety-critical
An outlet or breaker that trips instantly on a ground fault to protect people from shock; required near water.
Every outlet in the bathroom has to be GFCI protected. — Todos los contactos del baño tienen que estar protegidos con GFCI.
- ground GROWNDtierra física TYEH-rrah FEE-see-kah Safety-critical
The safety connection that gives stray current a path into the earth instead of through a person.
Never cut the ground off a cord; it can save your life. — Nunca le cortes la tierra física a una extensión; te puede salvar la vida.
Also: puesta a tierra (general)
- ground wire GROWND WAI-ercable de tierra KAH-bleh deh TYEH-rrah Safety-critical
The bare or green wire that ties devices and boxes to the grounding system.
Pigtail the ground wire to the box and the receptacle. — Haz una colita con el cable de tierra a la caja y al contacto.
- grounding rod GROWN-ding RODvarilla de tierra vah-REE-yah deh TYEH-rrah Safety-critical
The copper rod driven into the earth that anchors the building's grounding system.
Drive the grounding rod eight feet down next to the meter. — Clava la varilla de tierra ocho pies junto al medidor.
- high voltage HAI VOHL-tijalto voltaje AHL-toh vohl-TAH-heh Safety-critical
Dangerously high electrical pressure; stay clear and treat marked areas as deadly.
That transformer cabinet is high voltage; only the utility opens it. — Ese gabinete del transformador es de alto voltaje; solo la compañía de luz lo abre.
Also: alta tensión (general)
- home run HOHM RUNlínea directa al panel LEE-neh-ah dee-REK-tah al pah-NEL
The first run of wire or conduit that goes all the way from a circuit back to the panel.
Label the home run so we know which breaker it lands on. — Etiqueta la línea directa al panel para saber a qué interruptor llega.
Also: el home run (MX)
- hot wire HOT WAI-ercable vivo KAH-bleh VEE-voh Safety-critical
The wire that carries live voltage from the panel, usually black or red; it can shock you.
Test before you touch; that hot wire is still energized. — Prueba antes de tocar; ese cable vivo todavía tiene corriente.
Also: fase (general) · el positivo (MX)
- junction box JUNK-shun BOKScaja de conexiones KAH-hah deh koh-nek-SYOH-nes
A covered box where wires are spliced together; splices must never be buried in the wall.
Every splice goes inside a junction box with a cover. — Cada empalme va dentro de una caja de conexiones con su tapa.
Also: caja de registro (general)
- kill the power KIL thuh POW-ercorta la corriente KOR-tah lah koh-RRYEN-teh Safety-critical
Shut off all electricity to the circuit or equipment right now.
Kill the power before anybody touches that box. — Corta la corriente antes de que alguien toque esa caja.
Also: mata la luz (MX)
- knockout NOK-outknockout noh-KAHT
The pre-punched round disc on a box or panel you pop out to bring a conduit or cable in.
Pop a knockout on the side of the box for the flex. — Bota un knockout en el costado de la caja para el flexible.
Also: perforación desprendible (general)
- LED el-ee-DEELED LED
Low-energy lighting technology that runs cool and lasts far longer than old bulbs.
The whole building is getting LED fixtures. — Todo el edificio va a llevar luminarias LED.
- light fixture LAIT FIKS-cherluminaria loo-mee-NAH-ryah
The complete light unit that mounts to the ceiling or wall.
The light fixtures for the lobby arrive Thursday. — Las luminarias del lobby llegan el jueves.
Also: lámpara (MX)
- lineman's pliers LAIN-manz PLAI-erspinzas de electricista PEEN-sahs deh eh-lek-tree-SEES-tah
Heavy square-nose pliers electricians use to twist, pull, and cut wire.
Twist those grounds together with your lineman's pliers. — Trenza esas tierras con tus pinzas de electricista.
- live LAIVvivo VEE-voh Safety-critical
Carrying voltage right now; treat every wire as live until you test it.
Careful, that panel is still live. — Aguas, ese panel todavía está vivo.
Also: energizado (general)
- load LOHDcarga KAR-gah
Everything drawing power on a circuit or service.
Figure the load before you size the feeder. — Calcula la carga antes de elegir el alimentador.
- lockout tagout LOK-out TAG-outbloqueo y etiquetado bloh-KEH-oh ee eh-tee-keh-TAH-doh Safety-critical
The OSHA procedure of locking and tagging a power source so no one can turn it on while people work.
Nobody works on that machine without lockout tagout. — Nadie trabaja en esa máquina sin bloqueo y etiquetado.
Also: candadeo (general)
- low voltage LOH VOHL-tijbajo voltaje BAH-hoh vohl-TAH-heh
Wiring under 50 volts, like doorbell, thermostat, data, and alarm cables.
The low voltage crew comes after the electricians rough in. — La cuadrilla de bajo voltaje entra después de la obra negra de los electricistas.
- lug LUGzapata sah-PAH-tah
The heavy metal clamp terminal where big conductors bolt onto a panel or piece of equipment.
Torque the lugs on the main before energizing. — Dale torque a las zapatas del principal antes de energizar.
- main breaker MAYN BRAY-kerinterruptor principal een-teh-roop-TOHR preen-see-PAHL Safety-critical
The big breaker at the top of the panel that shuts off power to the whole building.
Shut off the main breaker before you pull the panel cover. — Apaga el interruptor principal antes de quitar la tapa del centro de carga.
Also: pastilla principal (MX)
- MC cable em-SEE KAY-bulcable MC KAH-bleh EH-meh SEH
Cable with a flexible metal armor around the wires, common in commercial framing.
Rough in the offices with MC cable, not EMT. — Haz la obra negra de las oficinas con cable MC, no con EMT.
Also: cable armado (general)
- meter MEE-termedidor meh-dee-DOHR
The utility device that measures how much electricity the building uses.
The inspector has to sign off before the utility sets the meter. — El inspector tiene que aprobar antes de que pongan el medidor.
- meter base MEE-ter BAYSbase del medidor BAH-seh del meh-dee-DOHR
The socket enclosure on the wall where the utility's electric meter plugs in.
Mount the meter base at eye level next to the panel. — Monta la base del medidor a la altura de los ojos junto al panel.
- mud ring MUD RINGanillo de yeso ah-NEE-yoh deh YEH-soh
The raised ring on a box that brings the device opening flush with the finished wall.
Use a half-inch mud ring for five-eighths drywall. — Usa un anillo de yeso de media para tablaroca de cinco octavos.
- multimeter MUL-tee-mee-termultímetro mool-TEE-meh-troh
The meter that reads voltage, current, resistance, and continuity.
Put the multimeter on the terminals and tell me what you read. — Pon el multímetro en las terminales y dime qué lectura te da.
- neutral NOO-trulneutro neh-OO-troh Safety-critical
The white grounded conductor that carries current back to the panel to complete the circuit.
Don't share a neutral between those two circuits. — No compartas el neutro entre esos dos circuitos.
- old work box OHLD WERK BOKScaja para remodelación KAH-hah PAH-rah reh-moh-deh-lah-SYOHN
A box with wings that clamps into existing drywall where there is no stud to nail to.
Cut the hole and pop an old work box in for the new outlet. — Corta el hueco y mete una caja para remodelación para el contacto nuevo.
- outlet OUT-letcontacto kohn-TAK-toh
The wall point where you plug in tools and appliances.
Set the outlets at 16 inches to center off the floor. — Pon los contactos a 16 pulgadas al centro desde el piso.
Also: tomacorriente (general) · enchufe (PR)
- outlet box OUT-let BOKSchalupa chah-LOO-pah
The single-gang box set in the wall that holds an outlet or switch.
Nail an outlet box to that stud at switch height. — Clava una chalupa en ese barrote a la altura del apagador.
Also: caja para contacto (general)
- overload OH-ver-lohdsobrecarga soh-breh-KAR-gah Safety-critical
Too much load on a circuit, which heats the wires and trips the breaker.
Two heaters on one cord is an overload waiting to happen. — Dos calentadores en una sola extensión es una sobrecarga segura.
- panel PA-nelcentro de carga SEN-troh deh KAR-gah
The metal box that holds the breakers and distributes power to every circuit.
Label every breaker in the panel before we close up. — Etiqueta cada interruptor del centro de carga antes de cerrar.
Also: tablero eléctrico (general) · caja de breakers (PR)
- phase FAYZfase FAH-seh
One energized leg of the electrical supply; panels can have one, two, or three of them.
Balance the loads across all three phases. — Balancea las cargas entre las tres fases.
- pigtail PIG-taylcolita koh-LEE-tah
A short piece of wire spliced in to connect a device to the wires in the box.
Make a pigtail so the receptacle isn't carrying the whole circuit. — Haz una colita para que el contacto no cargue todo el circuito.
Also: puente (general)
- pull box PUL BOKScaja de registro KAH-hah deh reh-HEES-troh
A larger box placed in long conduit runs to make wire pulling easier.
Set a pull box every hundred feet on that run. — Pon una caja de registro cada cien pies en esa corrida.
- pull wire PUL WAI-erjalar cable hah-LAHR KAH-bleh
To feed and drag conductors through conduit from one box to another.
We pull wire on the third floor after lunch. — Jalamos cable en el tercer piso después del lonche.
- PVC conduit pee-vee-SEE KON-doo-ittubo conduit de PVC TOO-boh kon-DOO-eet deh peh-veh-SEH
Gray plastic conduit glued together, used underground and in wet areas.
Bury the PVC conduit eighteen inches deep in the trench. — Entierra el tubo de PVC a dieciocho pulgadas de profundidad en la zanja.
- receptacle reh-SEP-tah-kultoma de corriente TOH-mah deh koh-RRYEN-teh
The actual device with slots that receives a plug; the formal word for an outlet.
Swap that damaged receptacle for a tamper-resistant one. — Cambia esa toma de corriente dañada por una a prueba de niños.
Also: contacto (MX)
- recessed light ree-SEST LAITlámpara empotrada LAHM-pah-rah em-poh-TRAH-dah
A light set up inside the ceiling so only the trim shows; crews call them cans.
Lay out the recessed lights on four-foot centers. — Traza las lámparas empotradas a cada cuatro pies.
- rigid conduit RIH-jid KON-doo-ittubo conduit rígido TOO-boh kon-DOO-eet REE-hee-doh
Heavy threaded steel conduit used where wiring needs maximum protection, like service risers.
The riser to the weatherhead has to be rigid conduit. — La subida a la mufa tiene que ser de tubo rígido.
Also: tubería rígida (general)
- romex ROH-mekscable romex KAH-bleh ROH-meks
Plastic-jacketed cable with hot, neutral, and ground wires; the standard wiring for houses.
Staple the romex every four and a half feet along the stud. — Engrapa el romex cada cuatro pies y medio a lo largo del barrote.
Also: cable NM (general)
- rough-in RUF-inobra negra OH-brah NEH-grah
The first stage of wiring: boxes, conduit, and cable installed before drywall goes up.
The electrical rough-in has to pass inspection before insulation. — La obra negra eléctrica tiene que pasar inspección antes del aislamiento.
Also: el rough (MX)
- service drop SER-vis DROPbajada de acometida bah-HAH-dah deh ah-koh-meh-TEE-dah Safety-critical
The overhead wires that run from the utility pole down to the building.
Keep the scaffold away from the service drop. — Mantén el andamio lejos de la bajada de acometida.
- service entrance SER-vis EN-transacometida ah-koh-meh-TEE-dah
The point and equipment where utility power enters the building.
We're upgrading the service entrance to 200 amps. — Vamos a subir la acometida a 200 amperes.
- shock SHOKdescarga eléctrica des-KAR-gah eh-LEK-tree-kah Safety-critical
Electric current passing through the body; even 120 volts can kill.
He got a shock off that ungrounded tool; tag it out. — Le dio una descarga eléctrica esa herramienta sin tierra; etiquétala y sácala.
Also: toques (MX)
- short circuit SHORT SER-kitcorto circuito KOR-toh seer-KWEE-toh Safety-critical
A fault where hot touches neutral or ground, dumping huge current and tripping the breaker.
The breaker trips instantly; there's a short circuit somewhere. — El interruptor se bota al instante; hay un corto circuito en algún lado.
- single-phase SIN-gul FAYZmonofásico moh-noh-FAH-see-koh
Power with one alternating phase, the standard supply for houses.
This house has standard single-phase 120/240 service. — Esta casa tiene servicio monofásico estándar de 120/240.
- smoke detector SMOHK dee-TEK-tordetector de humo deh-tek-TOHR deh OO-moh Safety-critical
The alarm that sounds when it senses smoke; hardwired units are interconnected so all sound together.
Code requires a smoke detector in every bedroom. — El código exige un detector de humo en cada recámara.
- socket SAH-ketsoquet soh-KET
The threaded holder a bulb screws into.
The socket is burnt; replace it before hanging the fixture. — El soquet está quemado; cámbialo antes de colgar la lámpara.
Also: portalámparas (general)
- splice SPLAISempalmar em-pahl-MAHR
To join two or more wires together inside a box.
Splice the new run to the old circuit in the junction box. — Empalma la corrida nueva al circuito viejo en la caja de conexiones.
- staple STAY-pulgrapa GRAH-pah
The fastener hammered over romex to hold it against studs and joists.
Don't drive the staple so hard that it pinches the cable. — No claves la grapa tan fuerte que machuque el cable.
- strap STRAPabrazadera ah-brah-sah-DEH-rah
The clamp that fastens conduit to the wall or structure at set intervals.
Code says a strap within three feet of every box. — El código pide una abrazadera a menos de tres pies de cada caja.
Also: omega (general)
- strip STRIPpelar peh-LAHR
To remove the insulation from the end of a wire so it can be connected.
Strip about three quarters of an inch off each wire. — Pela como tres cuartos de pulgada de cada alambre.
- stub-up STUB-uptubo saliente TOO-boh sah-LYEN-teh
A short piece of conduit left sticking up out of the slab or wall for a future connection.
Mark every stub-up before the concrete pour. — Marca cada tubo saliente antes del colado.
Also: el stub (MX)
- subpanel SUB-pa-nelsubcentro de carga soob-SEN-troh deh KAR-gah
A smaller secondary panel fed from the main panel, often for a garage or addition.
The shop gets a 60-amp subpanel off the main panel. — El taller lleva un subpanel de 60 amperes desde el panel principal.
- switch SWICHapagador ah-pah-gah-DOHR
The device on the wall that turns lights or equipment on and off.
Put the switch on the latch side of the door. — Pon el apagador del lado de la chapa de la puerta.
Also: interruptor de luz (general) · switch (PR)
- temporary power TEM-poh-reh-ree POW-erluz provisional LOOS proh-vee-syoh-NAHL
The GFCI-protected power setup that feeds the jobsite while the building is under construction.
The temporary power pole goes in before framing starts. — El poste de luz provisional se pone antes de empezar la estructura.
- terminal TER-mih-nalterminal tehr-mee-NAHL
The screw or point on a device where a wire is landed.
Tighten every terminal to the torque on the label. — Aprieta cada terminal al torque que marca la etiqueta.
- THHN tee-aych-aych-ENcable THHN KAH-bleh teh-AH-cheh-AH-cheh-EH-neh
Individual insulated building wire rated for heat, pulled inside conduit.
Load the cart with number 12 THHN in four colors. — Sube al carrito THHN calibre 12 en cuatro colores.
- three-phase THREE FAYZtrifásico tree-FAH-see-koh
Power with three alternating phases, used for big motors and commercial buildings.
The rooftop units need three-phase power. — Los equipos de azotea necesitan corriente trifásica.
- three-way switch THREE-way SWICHapagador de escalera ah-pah-gah-DOHR deh es-kah-LEH-rah
A pair of switches that control the same light from two locations, like both ends of a hallway.
Wire a three-way switch at the top and bottom of the stairs. — Cablea un apagador de escalera arriba y abajo de la escalera.
- transformer trans-FOR-mertransformador trans-for-mah-DOHR
Equipment that raises or lowers voltage, like the can on the pole or the box feeding the site.
The utility sets the transformer next week. — La compañía de luz instala el transformador la próxima semana.
- trim-out TRIM-outacabados ah-kah-BAH-dohs
The finish stage: installing devices, plates, and fixtures after paint.
We start trim-out on the first floor Monday. — Empezamos los acabados del primer piso el lunes.
Also: el trim (MX)
- voltage VOHL-tijvoltaje vohl-TAH-heh
The electrical pressure that pushes current through a wire, measured in volts.
Check the voltage at the outlet; it should read about 120. — Checa el voltaje en el contacto; debe marcar como 120.
- voltage drop VOHL-tij DROPcaída de voltaje kah-EE-dah deh vohl-TAH-heh
Voltage lost over a long run of wire; long runs need thicker wire to compensate.
Upsize to number 10 for that run or you'll have voltage drop. — Súbele a calibre 10 en esa corrida o vas a tener caída de voltaje.
- voltage tester VOHL-tij TES-terprobador de voltaje proh-bah-DOHR deh vohl-TAH-heh Safety-critical
A pen or two-lead tester that tells you whether a wire is live before you touch it.
Always check with the voltage tester, even if the breaker is off. — Siempre checa con el probador de voltaje, aunque el interruptor esté apagado.
- wattage WAH-tijpotencia poh-TEN-syah
The power a device uses, measured in watts; volts times amps.
Add up the wattage of the fixtures before sizing the dimmer. — Suma la potencia de las lámparas antes de elegir el atenuador.
- weatherhead WEH-ther-hedmufa MOO-fah
The curved fitting at the top of the service riser that keeps rain out of the conduit.
Leave three feet of wire hanging out of the weatherhead for the utility. — Deja tres pies de cable colgando de la mufa para la compañía de luz.
- wire WAI-eralambre ah-LAHM-breh
A single electrical conductor, bare or insulated, that carries current.
Pull three wires through that conduit: black, white, and green. — Jala tres alambres por ese tubo: negro, blanco y verde.
- wire nut WAI-er NUTcapuchón kah-poo-CHOHN
The twist-on plastic cap that joins two or more wires together.
Twist the wires tight before you put the wire nut on. — Trenza bien los alambres antes de ponerles el capuchón.
Also: conector de rosca (general)
- wire strippers WAI-er STRIH-perspinzas peladoras PEEN-sahs peh-lah-DOH-rahs
Pliers with sized notches that cut the insulation off a wire without nicking the copper.
Use the wire strippers, not your teeth or a knife. — Usa las pinzas peladoras, no los dientes ni la navaja.
Open this glossary in the app — search, favorites, and every term offline.
Construction
Get your crew on it
Create your account, make a crew, and text the invite code to your people — they join free. Everything is unlocked for your first 14 days; the glossary is free forever, account or not.
Create your free account Try the glossary — no account
Every new account gets Pro free for 14 days. No card needed.